Bitzu

AZ-305 ยท Migration design

Planning a migration with the Cloud Adoption Framework

CAF phases (strategy, plan, ready, adopt, govern, manage), landing zone readiness, rationalization options: retire, rehost, replatform, refactor, rearchitect, rebuild, replace.

Key points

  • CAF: Strategy, Plan, Ready (landing zone), Adopt (migrate, modernize), Govern, Secure, Manage.
  • Retire: low-value systems; Rehost: like-for-like, e.g. to Azure VMs.
  • Replatform: PaaS, minimal code change; Refactor: better code, no new features.
  • Rearchitect: redesign; Rebuild: cloud-native; Replace: SaaS; Retain: keep (optionally Azure Arc).
  • Migration: plan, prepare, execute, optimize, decommission source.

Source: https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/plan/select-cloud-migration-strategy

Practice questions

Single choice

In the Cloud Adoption Framework, which phase answers the question of how the Azure landing zone will be built?

  1. Strategy
  2. Ready
  3. Adopt
  4. Manage
Show answer

Answer: B. Ready

Ready is the phase that prepares the Azure environment, i.e. the landing zone, before workloads move. Adopt is where workloads are actually migrated or modernized, so it depends on Ready being done first.

Select all that apply

Which signals point to replatform as the migration strategy for a workload?

  1. You want to drop OS patching and licensing overhead by using PaaS
  2. The team can containerize the app with moderate effort
  3. The legacy code must be redeveloped from scratch as cloud-native
  4. The workload has little current or future business value
  5. Disaster recovery should become simpler through managed services
Show answer

Answer: A. You want to drop OS patching and licensing overhead by using PaaS, B. The team can containerize the app with moderate effort, E. Disaster recovery should become simpler through managed services

Replatform moves a workload to a PaaS or container host with minimal code change, typically to cut OS and licensing overhead, simplify reliability and disaster recovery, or repackage the app with moderate effort. A full cloud-native redevelopment is rebuild, and limited business value points to retire.

True or false

Rehosting a workload to Azure VMs fixes its existing performance and architectural problems, because the cloud infrastructure underneath is newer.

Show answer

Answer: False

False. A rehost moves the workload as it is, so its performance, reliability and design issues travel with it. CAF advises against rehosting problematic workloads and suggests modernizing them during migration instead.

Practice 8 questions on this topic in Bitzu

Short lessons, instant explanations and spaced review of what you get wrong. Free on iOS and Android.

Download on the App StoreGet it on Google Play

More AZ-305 topics in this module