Asset, threat, vulnerability, likelihood, impact: how do they form risk?

Definitions of asset, threat, vulnerability, exploit, likelihood, impact and how they combine into risk.

Key points

  • An asset is something of value.
  • A threat is anything that could harm it.
  • A vulnerability is a weakness a threat can use, and an exploit is the way it is used.
  • Risk is the chance (likelihood) that a threat takes advantage of a vulnerability multiplied in effect by the harm (impact) it would cause.
  • No threat, no vulnerability or no valuable asset means little or no risk.

Source: https://csrc.nist.gov/glossary/term/risk

Practice questions

Single choice

Which term describes a weakness that could be used to cause harm to an asset?

  1. Threat
  2. Vulnerability
  3. Exploit
  4. Impact
Show answer

Answer: B. Vulnerability

A vulnerability is a weakness. A threat is the source of potential harm, an exploit is the means of using a weakness, and impact is the resulting damage.

Select all that apply

Which statements about risk are correct?

  1. Risk reflects both likelihood and impact
  2. Risk can always be reduced to exactly zero
  3. A vulnerability needs a threat that can use it to create real risk
  4. Protecting an asset well lowers the asset's value
  5. Higher impact with the same likelihood means higher risk
Show answer

Answer: A. Risk reflects both likelihood and impact, C. A vulnerability needs a threat that can use it to create real risk, E. Higher impact with the same likelihood means higher risk

Risk depends on both how likely an event is and how bad it would be. Without a threat able to use a weakness, a vulnerability alone creates little risk. Risk cannot be reduced to zero and an asset's value does not drop because it is well protected.

True or false

True or false: finding a vulnerability on a system always means the organisation faces high risk.

Show answer

Answer: False

False. Risk also depends on whether a threat can reach and use the weakness and on the impact. A minor flaw on an isolated test machine may be a low risk.

Practice 8 questions on this topic in Bitzu