CC ยท GRC and business continuity
Business impact analysis (BIA)
Purpose of a BIA, critical functions, RTO, RPO, MTD and how they set recovery priorities.
Key points
- A BIA studies what happens to the business when a function stops.
- It identifies critical functions, their dependencies and the cost of downtime, then sets targets: MTD (longest outage the business can survive), RTO (target time to restore, kept below MTD) and RPO (how much data loss, measured in time, is acceptable).
- These targets set recovery priorities.
Source: https://csrc.nist.gov/glossary/term/business_impact_analysis
Practice questions
What does RPO describe?
- The maximum acceptable amount of data loss measured in time
- The time allowed to restore a service
- The cost of the recovery site
- The number of staff needed for recovery
Show answer
Answer: A. The maximum acceptable amount of data loss measured in time
RPO is about data: how far back in time you can lose data. RTO is about how long restoration takes.
Which items are typical outputs of a BIA?
- A prioritized list of critical business functions
- Recovery time and recovery point targets
- A selected antivirus product
- A phishing awareness course
- A firewall rule set
Show answer
Answer: A. A prioritized list of critical business functions, B. Recovery time and recovery point targets
A BIA yields a ranked list of critical functions and recovery targets. Selecting antivirus products and writing awareness training are not BIA outputs.
True or false: the RTO should be longer than the MTD so the team has extra time.
Show answer
Answer: False
False. The MTD is the longest outage tolerable; the RTO must fit inside it, so RTO is shorter than MTD.
Practice 8 questions on this topic in Bitzu
Short lessons, instant explanations and spaced review of what you get wrong. Free on iOS and Android.