Bitzu

CC ยท GRC and business continuity

Business impact analysis (BIA)

Purpose of a BIA, critical functions, RTO, RPO, MTD and how they set recovery priorities.

Key points

  • A BIA studies what happens to the business when a function stops.
  • It identifies critical functions, their dependencies and the cost of downtime, then sets targets: MTD (longest outage the business can survive), RTO (target time to restore, kept below MTD) and RPO (how much data loss, measured in time, is acceptable).
  • These targets set recovery priorities.

Source: https://csrc.nist.gov/glossary/term/business_impact_analysis

Practice questions

Single choice

What does RPO describe?

  1. The maximum acceptable amount of data loss measured in time
  2. The time allowed to restore a service
  3. The cost of the recovery site
  4. The number of staff needed for recovery
Show answer

Answer: A. The maximum acceptable amount of data loss measured in time

RPO is about data: how far back in time you can lose data. RTO is about how long restoration takes.

Select all that apply

Which items are typical outputs of a BIA?

  1. A prioritized list of critical business functions
  2. Recovery time and recovery point targets
  3. A selected antivirus product
  4. A phishing awareness course
  5. A firewall rule set
Show answer

Answer: A. A prioritized list of critical business functions, B. Recovery time and recovery point targets

A BIA yields a ranked list of critical functions and recovery targets. Selecting antivirus products and writing awareness training are not BIA outputs.

True or false

True or false: the RTO should be longer than the MTD so the team has extra time.

Show answer

Answer: False

False. The MTD is the longest outage tolerable; the RTO must fit inside it, so RTO is shorter than MTD.

Practice 8 questions on this topic in Bitzu

Short lessons, instant explanations and spaced review of what you get wrong. Free on iOS and Android.

Download on the App StoreGet it on Google Play

More CC topics in this module